Technology for slab track

Schranz Bahntechnik GmbH is a system supplier for installation accessories of slab tracks in sleeper construction. (e.g.: Rheda2000 and LVT). Our product portfolio includes a patented track adjustment system and special machines for installation

Application area

  • Adaptation of our products and special machines to your requirements and needs
  • Development and production of special machines according to your specifications and our experience

  • Concept development and machine construction for special requirements, e.g.: Track construction in single-track tunnel

Products

Track adjustment system

  • Patented system for adjustment and fixing of the track
  • Suitable for Rheda2000 and LVT among others
  • Keeps the track in position during filling of the concrete
  • The adjusted track is drivable with special concreting machines

Formwork

  • Coordinated with the track adjustment system
  • Reusable steel formwork
  • Shuttering for filling the concrete
  • Flexible angle adjustment to fit into the superelevation
  • Special elements are available, e.g.: for switch construction

Concrete Train

  • Self-driving working machine for placing the filling concrete
  • ptimized axle load distribution, adapted to the track adjustment system
  • 9 Smoothing places
  • Hydraulic drive
  • Hydraulically tiltable distributor box with distributor auger
  • 3 hydraulically controlled outlet slides
  • 3-axis adjustable conveyor belt
  • CE – Declaration of Conformity

Track transporter

  • Drive unit based on Wacker DW30
  • Usable as a transport vehicle
  • Usable as a concreting vehicle
  • Electric variant based on Wacker DW15e
  • CE – Declaration of Conformity

AGL – paving screed

  • Chassis with releasable winch drive
  • Height adjustment on both sides by means of spindle drive
  • Vibrating screed and chassis decoupled from vibrations
  • CE – Declaration of Conformity

Concrete cutter

  • Power cutting engine 7,5kW
  • Electric drive
  • Adjustable guidance along the rail
  • Additional function: combination of 2 machines for 2 cuts in one operation
  • CE – Declaration of Conformity

New developments

We will complete our product portfolio for the entire slab track construction process chain. This will make it possible to significantly reduce manpower requirements.

The following equipment is currently under development:

  • Concrete train BZ3
    Compact design
    Flexible track gauge
    Automated smoothing device
    Additional concrete shuttle, ideal for single-track tunnels

  • Sleeper laying device
    Integrated position measurement for sleeper placement
    Attachment to 3to – 6to excavator

  • Preliminary leveling unit
    Improved preliminary leveling of the track
    Increased accuracy in this process step

About us

Our entire product portfolio was used, for example, on the new Wendlingen – Ulm line as part of Stuttgart 21. Thanks to the complete system coordinated by us, the average output during construction of the slab track was 200m in 12 hours. In 24h operation, a maximum performance of 400m was realized. This performance could only be achieved by the robust and practical design of our products.

References

Contact

Are you looking for contact to

Schranz Bahntechnik GmbH?

 

Then please write to:

 

Schranz Bahntechnik GmbH

Wiesenbrunnweg 8

5400 Hallein

 

M +43 (0)664 2664395

E office@schranz-bahntechnik.at

www.schranz-bahntechnik.at

Company registration number: FN537646g

UID: ATU75782814

© 2021 Schranz Bahntechnik GmbH I Impressum I Datenschutzerklärung